planning_dept

Environmental Impact Report for the Bayfront Project

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Final EIR Available

Project Update

Pursuant to the California Environmental Quality Act (CEQA), the City of Hercules in 2011 certified a Final Environmental Impact Report (FEIR) for the Bayfront project project (also referred to as the Waterfront). The EIR discusses the potential for significant impacts on the environment, as well as mitigation measures to minimize impacts. The EIR, identified as State Clearinghouse Number 2009112058, may be viewed via the links below to separate sections of the document.

Bayfront Draft EIR: 

Bayfront Draft EIR: Appendices

Bayfront Final EIR

  • Bayfront Final EIR (2.4 MB PDF)
    (includes responses to comments on Draft EIR and revisions to Draft EIR)

 Copies of the EIR are also available for review at the following locations:

City of Hercules
111 Civic Drive
Hercules, CA 94547
(510) 799-8200
          Hercules Library
109 Civic Drive
Hercules, CA 94547
(510) 245-2420

 

If you would like a hard copy or CD of the EIR mailed to you, please contact the Planning Department.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer